Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterVanities, Tile & Fixtures in Fremont, CA
Vanities, tile and fixtures are the three surfaces you actually touch every morning, and upgrading them is the fastest way to make an older Fremont bathroom feel finished. Most vanity-and-tile projects here land between $4,200 and $16,500 depending on square footage, tile selection and whether plumbing has to move; a single vanity swap with new fixtures can stay under $2,500. Barrett & Sons Construction Fremont has been an owner-operated local builder since 1998, and our technicians bring up to 28 years of experience to the exact work that makes or breaks a bathroom: level vanities, flat tile, and fixtures that don’t drip a year later.
This page covers the finish work as a piece of a bigger job. If you’re reworking the room from the studs out – new shower pan, waterproofing, venting, layout – start with our Bathroom Remodeling service and we’ll scope the whole thing. If you want the full-service version of a Fremont bathroom project, see Bathroom Remodeling in Fremont.
Call (833) 620-6162 and a live person answers, day or night. Not a voicemail box, not a call center three time zones away.

Key Takeaways
- Vanity, tile and fixture work usually runs $4,200 to $16,500 in Fremont; a straight vanity swap with new fixtures can come in under $2,500.
- Every price change is written on a change order before any work starts, so the number on the estimate is the number on the invoice.
- Permits get pulled and inspections signed on every eligible job. Tile over a shower or wet area almost always needs one.
- Our technicians have up to 28 years of experience with tile layout, vanity framing and fixture installs.
- The written 90-Day Done Right Promise covers every completed job. If it’s not right, Tom comes back.
When You Need Vanities, Tile & Fixtures
Finish work is usually triggered by something specific – a failure, a sale, a change in how the room has to work. These are the calls we get most often around Fremont.
- The vanity is sagging or soft at the base. Fremont’s older single-story homes around Centerville and Irvington often have vanities built against a wall that’s seen forty-plus years of splash and slow leaks. Once the cabinet box swells, no amount of paint fixes it. We replace the vanity and check the wall and floor behind it while it’s open.
- Tile is popping, cracking, or grout is coming out in sheets. Common on floors where the original tile was set over a thin subfloor, or in showers where waterproofing was skipped. In Niles and the older Mission district homes, we regularly see tile set over a mud bed that’s held up fine for decades – but the grout has failed and water’s getting behind it.
- Fixtures are original and dripping. A toilet that runs, a faucet that won’t stop, a shower valve that only does scalding or cold. If the fixture is 20+ years old, replacement is usually cheaper than the third repair visit.
- You’re selling or moving a parent in. A clean vanity, fresh tile and reliable fixtures are the fastest way to make a bathroom pass an inspection or a walkthrough. Many of our customers are doing this on a timeline.
- You want a taller or wider vanity. Standard 30-inch vanity heights are hard on backs. A comfort-height vanity with a wider top and better storage is a common ask from homeowners in their 50s and 60s.
- You’re matching a bathroom to a recently remodeled kitchen. If you did a kitchen with us, we can match countertop and tile selections so the two rooms don’t look like they came from different decades.

Our Vanities, Tile & Fixtures Process
We don’t start a nail until the scope is on paper. Here’s how a vanity, tile and fixture job actually runs with us.
- Measure and walk the room. We check floor flatness, wall plumb, plumbing rough-in locations, and whether the existing tile is set over a substrate that can take new tile. That last part matters most – it decides whether we can go over the old floor or have to tear it out.
- Write the scope and allowances. Every line item – vanity, top, faucet, tile, grout, trim – is written with an allowance before we start. Our position on this is simple: an allowance that isn’t on paper is a surprise waiting for a date. No surprise invoices at the end.
- Pull permits and schedule inspection. Any job that moves plumbing, replaces a shower pan, or changes electrical for a vanity light gets a permit. The permit inspector works for you, not for us – that’s why we like him.
- Demo, rough-in, and substrate. Old vanity out, old tile out if needed, plumbing and electrical adjusted for the new layout. Cement board and waterproofing go in before a single tile goes down in a wet area.
- Set tile and install the vanity. Tile layout is planned before the first piece is set so the cuts land where they should – not a sliver at the door or a bad line at the shower curb. The vanity goes in level and shimmed, with the top set and sealed.
- Fixtures, caulk, cleanup, final inspection. Faucet, toilet, shower trim, and lights go in and get tested. We caulk, clean, and walk the room with you. If anything isn’t right, the 90-Day Done Right Promise is on the contract – one call brings Tom back.
Vanities, Tile & Fixtures Pricing in Fremont
Here’s what the work actually costs in Fremont, based on how we scope it. Every price change arrives in writing before work moves, and your free estimate is a real number, not a phone-quote bait price.
| Line Item | Typical Range | What Moves the Number |
|---|---|---|
| Vanity swap (cabinet + top + faucet), no plumbing move | $1,200 – $3,400 | Vanity size, top material, faucet brand |
| Custom or semi-custom vanity with relocated plumbing | $2,800 – $6,500 | Moving drain/supply lines, wall repair, electrical |
| Floor tile (per square foot, installed) | $9 – $22 / sq ft | Tile material, pattern, subfloor prep |
| Shower wall tile with waterproofing | $2,400 – $6,800 | Pan replacement, waterproofing, tile size and layout |
| Grout and tile repair (spot work) | $250 – $900 | Scope, matching existing tile, access |
| Fixture package (toilet, faucet, shower trim, light) | $600 – $2,400 | Brand tier, finish, extra rough-in work |
| Full bathroom finish package (vanity + tile + fixtures) | $4,200 – $16,500 | Room size, tile choice, layout changes, permit |
A few things that reliably move cost up in Fremont: tile over an old mud-set floor where the demo is slow and the subfloor needs work; older homes around Centerville where the vanity wall has old galvanized supply lines that should be replaced while the wall is open; and any project that has to be done around a family still living in the house.
Things that keep it down: keeping the plumbing where it is, choosing a standard-size vanity (30 to 48 inches) rather than a custom build, and picking tile from a line with a fast lead time rather than a special order.
The best way to know your number is a free estimate. If you already have a written bid from someone else, take advantage of our Free Second Opinion on Any Written Estimate – we’ll tell you whether the scope holds up. We also offer $40 Off Any Repair Over $200, No Trip Charge Inside the County, and a permanent 10% Senior & Veteran discount.
What Affects the Cost Most
Three things decide whether your job lands near the low end or the high end of that table.
- Waterproofing behind the tile. A shower that’s re-tiled without a proper waterproofing layer will fail, usually within a few years. If your current shower doesn’t have it, the scope has to include it – and that’s not a place to cut corners.
- Whether the plumbing moves. A vanity swap in the same spot is a simple job. Moving a drain line or supply lines across a wall means opening the wall, re-roughing, and patching – and that adds a real chunk to the bill.
- Tile material and pattern. A large-format porcelain set in a running bond goes down faster than a mosaic in a herringbone. Tile selection can swing the install cost by 30-40% on the same square footage.
Why Homeowners in Fremont Call Us
This is a family-run company – Tom Barrett and his sons run the crews, and Tom lives about twenty minutes away. If something’s wrong, he wants to know about it. Tom publishes his name, his address, and his license number – look them up before you sign anything.
We pull permits and get inspections signed on every eligible job because the last contractor most of our customers used told them permits were optional. Every scope change gets a written change order before work moves. And every completed job gets the 90-Day Done Right Promise in writing, not buried in fine print.
We install brands you can look up rather than mystery brands off a van. On vanities and tile work that includes standard-setting materials from Oldcastle and Quikrete for setting beds and repairs, and for jobs that include a bathroom addition or a new slab under a remodeled bath, we spec Abodu for the structure. Nothing exotic, everything cross-checked against the spec sheet.
If you want the whole picture on what a bathroom project involves, our home page lays out the trades we cover. If you’re ready to talk floors, vanities or tile, call (833) 620-6162 and a real person answers.
FAQs – Vanities, Tile & Fixtures
How much does a vanity and tile job cost in Fremont?
A vanity and tile job in Fremont typically costs $4,200 to $16,500 depending on the room size, tile selection and whether plumbing moves. A straight vanity swap with a new top and faucet can run $1,200 to $3,400, and floor tile runs roughly $9 to $22 per square foot installed. Call (833) 620-6162 for an exact quote – estimates are free.
Can you replace a vanity without moving the plumbing?
Yes, and that’s the simplest version of the job. If the new vanity drops into the same spot as the old one, the drain and supply lines usually stay put and the work is fast – often a half-day install plus finish work. Moving plumbing to another wall is a bigger scope with a permit and wall patching, and we’ll write that out on the estimate before we start.
Do I need a permit to re-tile a shower in Fremont?
Usually yes. Replacing a shower pan, moving plumbing, or changing a shower valve is permit work in Fremont, and a shower re-tile that goes down to the pan almost always triggers a plumbing inspection. We pull the permit and schedule the inspection on every eligible job. The permit inspector works for you, not for us – and passing inspection is a document you can hand a buyer.
How long does vanity, tile and fixture work take?
A straight vanity swap and new floor tile usually takes three to five working days. A full bathroom finish package with a shower re-tile, waterproofing, and a permit inspection typically runs two to three weeks, with tile setting and grout cure taking the longest stretch. Your written scope will have the timeline on it from day one, and if the schedule has to move, you’ll hear about it before it does.
Ready to Finish the Bathroom?
Vanities, tile and fixtures are small enough to feel manageable and detailed enough to get wrong. Get it right the first time. Call (833) 620-6162 for a free estimate – a live person answers 24/7, the scope and allowances go in writing, and the 90-Day Done Right Promise comes with the contract. Ask a neighbor on your street – or look up the license number yourself.