







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Driveway & Pavers: The Fremont Owner’s Guide
We install driveway and paver work for Fremont homeowners every month, and the installed price for a paver driveway here typically runs $7,000 – $18,000 depending on square footage, base prep, and whether we’re replacing failing concrete or asphalt at the same time. Concrete driveway installation in Fremont lands around $4,500 – $12,000, and asphalt paving sits at $3,500 – $9,000. We can’t promise same-day work on a driveway – nobody should, and if a contractor tells you they can, ask for that in writing on the estimate.

Most Fremont owners find out their driveway and paver surface is failing the same way: a hairline crack that widens after one rainy season, a paver edge that starts settling toward the street before the next storm, or that familiar “river” of standing water across the garage apron that never quite drains. KraftMaid doesn’t manufacture the paver itself, so when we’re installing hardscape for a KraftMaid kitchen or cabinetry customer, we’re sourcing the paver or concrete from premium hardscape lines (Belgard, Techo-Bloc) and integrating the driveway work into the same project scope. That’s an important distinction: this is a hardscape page covering Brandon & Sons driveway work, not a KraftMaid parts lookup for a driveway component that doesn’t exist.
Which KraftMaid Models This Applies To

KraftMaid makes cabinetry – kitchen cabinets, bath vanities, built-in storage – not driveway pavers. If you landed here looking for a “KraftMaid driveway part number,” the honest answer is that there isn’t one. What KraftMaid affects on a driveway project is the sequence: when we remodel a Fremont kitchen with KraftMaid cabinets, the crew and material deliveries come through the driveway and garage apron. If that surface is already cracking or the pavers are lifting, the remodel you’re planning will both start worse and finish worse.
The compatibility question that actually matters for a Fremont driveway: matching the paver color and texture to the hardscape already on the property. KraftMaid cabinetry door styles skew traditional and shaker, which pairs naturally with a tumbled or dimensional paver (Techo-Bloc’s Travertina line is one we install often); movement to a clean-cut modern paver works better with KraftMaid’s slab-front door styles. The other compatibility gotcha – and this trips up a lot of Fremont homeowners near Niles and Mission San Jose – is base depth and drainage. Older Fremont lots around Centerville and Irvington were often poured for a side yard that didn’t exist yet, and a new paver driveway laid over the original 4-inch aggregate base will heave within two winters. We spec 6 inches of compacted Class II base for a paver driveway, 4 inches of concrete for a standard pour, and add a French drain or channel drain where the slope runs at the garage. Pull the Fremont building permit and the inspector will check the base and drainage; that’s the part most contractors skip. If Cambria or Silestone countertops are also in the scope and you’ve got a written estimate from someone else, we’ll give you a free second opinion on it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Fremont Driveway & Pavers Is Failing
Fremont’s clay-heavy soils and the wet-dry swings from January through April punish a driveway faster than most of the Bay Area. Here’s what we see when we walk a property:
- Hairline cracks that widen every spring. Caused by base failure underneath – the subgrade settles after a wet winter and the slab has nothing to sit on. If the crack opens and closes with the seasons, the fix isn’t crack filler, it’s base.
- Pavers settling or walking toward the street. Edge restraint failure is the usual culprit. Without a proper polymeric joint sand and a steel or concrete edge, pavers migrate downhill – and in Fremont, “downhill” is often toward the storm drain on the curb.
- Standing water across the garage apron. Grading is the issue, usually a slab that was poured dead-level instead of with the 2% slope a driveway needs to drain. Water at the garage door means water in the garage door.
- Spalling and surface flaking on a concrete slab. Deicing salt isn’t the culprit here – it’s the wrong concrete mix ratio or a pour that was finished too wet. Common on driveways installed in the 90s and early 2000s in Fremont.
- Weeds and moss pushing through paver joints. Missing or degraded joint sand, which lets water in and starts the freeze-thaw cycle we do get in Fremont’s inland pockets. Resanding is cheap; ignoring it puts you in a re-lay.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s how a Fremont driveway job prices out, with the exact ranges we quote:
| Work | Fremont range |
|---|---|
| Paver driveway installation | $7,000 – $18,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Asphalt driveway paving | $3,500 – $9,000 |
| Driveway replacement (demo + new) | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
| Paver patio installation | $3,500 – $11,000 |
What drives the range: square footage, base condition (demo of the old slab adds $1,500 – $4,000 alone), drainage work, and paver selection. Belgard and Techo-Bloc pavers run higher than standard concrete, and the difference is real – a Techo-Bloc paver has a much longer service life under Fremont’s wet-winter load than a basic gray concrete paver. Every price change arrives as a written change order before the work moves – no surprise invoices, no “the allowance wasn’t on paper” line items. Every eligible job includes permits pulled and the Fremont inspector’s sign-off. Every driveway we finish is backed by the written 90-Day Done Right Promise – if something’s not right, Tom comes back and makes it right, one call.
DIY or Call Us?
Some driveway work is genuinely safe to handle yourself: sweeping back blown sand and refilling paver joints with polymeric sand is something any homeowner can do with a push broom and a hose. Sealing a concrete or asphalt driveway is fine if you get the weather window right – Fremont’s mild fall is the best window, 50 – 70°F, no rain in the 48-hour forecast. The list of what real contractors should handle: base repair, drainage grading, cutting out and replacing a failing slab section, and any paver edge that’s walking out of restraint.
The spot where DIY goes wrong, and I see it most weekends: laying new pavers over an existing failing base. It looks fine for one season, then it heaves. The other one: cutting pavers on a wet saw without proper respirator and eye protection – silica dust is a genuine hazard, no scare tactics needed. If you’re not sure what’s under your slab, we’ll come look. We don’t charge a trip charge inside the county, and we’ll give you the honest answer on whether you’re looking at a repair or a full replacement. If you’ve got another contractor’s written estimate in hand, the free second opinion is a real offer, not a sales hook – we’ll tell you where the other bid is thin and where it’s fair. Call (833) 620-6162.
FAQs

A properly installed paver driveway with a compacted base and good edge restraint will last 25 – 30 years in Fremont’s climate, and the pavers themselves often outlast that. Concrete typically runs 20 – 25 years before cracking starts showing up, sometimes less on clay-heavy soil. Sealers add 2 – 4 years to the surface life. Call (833) 620-6162 for a free estimate and we’ll give you an honest read on what your existing surface has left.
Yes, often – and it’s the right answer more often than most contractors admit. Hairline cracks in a concrete slab can be routed and filled for a few hundred dollars; settling pavers can be lifted and re-bedded on a corrected base; failing joint sand is a $250 – $700 resand. What can’t be repaired is a slab with hairline base failure running the full length, or pavers walking out of restraint on a bad subgrade. Call (833) 620-6162 for the free second opinion on your estimate.
A paver driveway for a typical Fremont single-car to two-car drive runs 3 – 5 working days once the permit is in hand, including demo, base prep, and install. Concrete pours take 1 – 2 days plus a 7-day cure before you drive on it. Asphalt runs 1 – 2 days plus a few days to cure. Permits for a Fremont driveway replacement typically add a week or two to the front end of the schedule. Call (833) 620-6162 to schedule your free estimate.
We install Belgard, Techo-Bloc, and standard concrete pavers, all specified on the written estimate so you can look up the exact product and color before you sign. We don’t stock pavers ourselves – the material comes from the manufacturer’s local distributor, ordered by name and lot number so you can verify it at delivery. If the ordered color or lot doesn’t match, we don’t install it. Call (833) 620-6162 to schedule a free estimate and walk the material options with us.
Written by the team at Barrett & Sons Construction Fremont, serving Fremont and nearby areas.












