







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Fremont Owner’s Guide
We build CGI-compatible home additions and ADUs in Fremont, and installed pricing for an addition runs $45,000 – $130,000, while a full ADU lands at $90,000 – $220,000. Garage conversions sit lower, at $30,000 – $80,000. There’s no same-day anything here: an addition or ADU is a permitted, inspected build, and the timeline is measured in weeks and months, not hours.

Most Fremont owners don’t “discover a failed part.” They discover that the addition they paid for was framed without a permit, or that the ADU plans drawn up by a national outfit never accounted for Fremont’s hillside setbacks and utility tie-ins. The failing component is usually the paperwork and the structure behind it, not a hinge or a spring. And when an inspection gets flagged, the fix is often a rebuild of whatever was signed off on too quickly the first time.
Which CGI Models This Applies To

We treat CGI as the category of record set and spec the project around it, not a single product line. If you’re holding a CGI plan set, permit packet, or part schedule, bring it to the first walkthrough. We compare what’s specified against what Fremont’s building department and your lot actually allow. The label, plan number, and revision date on your documents tell us what we’re working from.
Compatibility gotchas matter more here than on a window or a cabinet. A CGI ADU plan drawn for a flat suburban lot won’t match a Fremont lot with a slope, a mature oak in the setback, or a shared sewer lateral. The structural schedule, the foundation detail, and the utility connection points all need to reflect your parcel, not a generic template. If the plan set was built for another jurisdiction, the seismic and Title 24 details usually need reworking before a Fremont inspector will sign off.
On the OEM-vs-aftermarket question: we’re not tied to a single supplier. We’ll work with CGI-based plans, or we’ll build to a licensed local designer’s drawings that meet the same intent. Barrett & Sons Construction Fremont is an independent builder and is not affiliated with CGI. We install KraftMaid, Cambria, and Silestone finishes inside these projects along with other brands you can look up by name.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
These are the signals Fremont owners call us about, and what’s usually underneath them:
- Inspection flagged unfinished or unpermitted work. A previous builder skipped the permit or framed to a plan that doesn’t match the lot. The correction is a re-permit and a rebuild of the flagged scope, not a cosmetic patch.
- Water intrusion at the addition roofline. The tie-in between the new roof and the existing house is the weak point. Poor flashing and a valley that wasn’t detailed right lets winter rain in, and Fremont’s wet-season runoff finds every gap.
- Cracks at the seam where the addition meets the original wall. Foundation differential or a missing structural connector shows up as a crack line. It needs an engineer’s look, not caulk.
- ADU power or plumbing that trips or backs up. A conversion or detached unit added load the panel wasn’t sized for, or tied into the wrong lateral. That’s a scope problem from the original build.
- Cold, drafty rooms in the new space. Insulation and air sealing that don’t meet Title 24, or a mini-split sized to a plan rather than the room. It fails the comfort test and sometimes the energy inspection.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Fremont, a home addition runs $45,000 – $130,000 installed. An ADU is the bigger build at $90,000 – $220,000, and a garage conversion is the leanest path at $30,000 – $80,000. Those ranges are real, not teaser numbers. What pushes you toward the top: a slope or hillside lot, a detached unit with its own utility trench, higher-end finishes, and any correction of unpermitted prior work.

Every price is line-itemed before we start, and every change comes as a written change order. An allowance that isn’t on paper is a surprise waiting for a date, so we put scope and allowances in writing up front. Permits get pulled and inspections signed on every eligible job. The work is backed by the 90-Day Done Right Promise, written on the contract: if it’s not right, we come back and make it right on one call. For a Fremont addition or ADU, call us for a written estimate before you commit to a plan set.
DIY or Call Us?
There’s little here an owner can safely do themselves, and we’d rather say so plainly. Adding onto a house or building an ADU touches structural framing, foundations, seismic ties, electrical, gas, and plumbing. A wrong load path or a mis-tied gas line is a genuine hazard, and the permit and inspection process is the homeowner’s protection, not a formality. The permit inspector works for you, not for us, and that’s exactly why we like him.
What you can do safely: gather your plan set and any prior permits, note where water has stained or cracked, and check the date and revision on your CGI documents. Then let a licensed builder confirm the scope. If you’ve been handed a bid that changes at the door, call (833) 620-6162. A second opinion on any written estimate is free, and we answer the phone with a live person.
FAQs

A properly permitted, inspected addition or ADU in Fremont should serve the life of the house, decades, when the foundation, roof tie-in, and weather sealing are done right. The failure mode is rarely age; it’s unpermitted or poorly detailed work that shows up within the first few wet seasons.
Sometimes, yes. A flashing leak at the roofline or an undersized panel can often be corrected without tearing down the addition. Structural and foundation problems usually call for a rebuild of the affected scope. We’ll tell you which one you’re facing after a walkthrough, and the estimate is free.
An addition typically runs several months from permit to final inspection, and an ADU longer, especially on a hillside or detached lot in Fremont. The timeline depends on plan approval, inspection scheduling, and finish selections. We give you a written schedule up front rather than a number that shifts later.
We work from your CGI plan set or a licensed local designer’s drawings, and we install named brands you can verify, including KraftMaid, Cambria, and Silestone for interiors. Nothing comes from an unknown supplier, and every scope and allowance is written into the contract before work starts. Call (833) 620-6162 for an exact quote.
Written by the team at Barrett & Sons Construction Fremont, serving Fremont and nearby areas.












