







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Techo-Bloc Driveway & Pavers: The Fremont Owner’s Guide
We install Techo-Bloc driveway and paver systems across Fremont, and a full paver driveway typically runs $7,000 – $18,000 installed, with paver patios at $3,500 – $11,000. If you’ve got a cracked, heaved, or sunken Techo-Bloc surface, we can usually walk it with you and hand you a written scope within a few days of your call. Barrett & Sons Construction is an independent installer and is not affiliated with Techo-Bloc.

Owners around Fremont usually find the problem the same way. A paver at the driveway apron rocks under the tire one morning. Sand starts washing out at a joint after a winter rain. A section of the walkway settles a half-inch and holds a puddle. By the time you notice, the base under that piece has already moved, and no amount of sweeping sand back into the joints fixes it. That’s what we hear on the phone, and it’s what we look for on site.
Key Takeaways
- Techo-Bloc paver driveways installed in Fremont typically run $7,000 – $18,000; patios run $3,500 – $11,000.
- Most failures we see are base and drainage problems, not the paver itself.
- We are an independent installer, not a Techo-Bloc dealer or the manufacturer.
- Every scope, allowance, and price change comes as a written change order before work moves forward, and every completed job carries our written 90-Day Done Right Promise.
Which Techo-Bloc Models This Applies To

Techo-Bloc builds pavers in families, and the family determines what goes back in the hole when a piece fails. Their driveway-grade lines include heavier, thicker units made for vehicle loads, while their patio and walkway lines sit at a lighter thickness. If your driveway is a driveway-rated Techo-Bloc product, a patio-grade unit of the same color family is not a correct match, even if it looks close in the sample photo. That mismatch is one of the most common things we find on failed patches done by someone else.
Here’s how to identify what you have. Most Techo-Bloc pavers are stamped or molded on the bottom with the manufacturer name; you have to lift a paver to see it, which is a careful job on a settled drive. Measure face dimensions and thickness in inches with a tape, not by eye. Thickness matters most: a driveway unit runs noticeably thicker than a walkway unit. Note the color and finish name from your original paperwork if you still have it.
On the replacement decision: matching your existing Techo-Bloc line from current production is the cleanest path, and color lots do drift over the years, so a blend-in takes judgment. A quality aftermarket paver in the same thickness and load class can be a reasonable substitute for a hidden or edge repair, but on a visible field, we tell people plainly: it will show. Fremont soil and drainage being what they are, getting the base right matters far more than the brand stamp on the face.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Techo-Bloc Driveway & Pavers Is Failing
Each of these points to a cause, and the cause is what we fix.
- Pavers rocking or shifting underfoot or under a tire. The bedding sand under that unit has washed out or the base has settled. Re-sanding alone hides it for a season.
- Sunken or heaved sections after rain. Water is getting under the surface where it shouldn’t, usually from a failed edge restraint or a slope that drains toward the house instead of away.
- Sand washing out of the joints every winter. Joints that won’t hold sand for more than a season signal an unstable base or missing edge confinement, not a sand problem.
- Cracked or chipped pavers, especially at the driveway apron. In Fremont, we see this most where a heavy vehicle or a poorly supported apron concentrates load on a unit that lost its base support.
- Weeds pushing up between pavers. Persistent growth in the same joints points to water pooling under the system, and pooled water under a driveway is the slow cause of most of the other four symptoms.
If you’re seeing two or more of these on the same Fremont driveway, the fix is usually a section rebuild with proper base and edge restraint, not a spot patch. We look at the whole surface before we quote it, so the number you get is the number for the real problem.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s what Fremont-area work runs, installed. We price base prep, drainage, edge restraint, and labor into these figures, and we write out anything that sits outside the initial scope before it happens.
| Work | Installed Range (Fremont) |
|---|---|
| Paver driveway installation | $7,000 – $18,000 |
| Paver patio installation | $3,500 – $11,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Driveway replacement | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
What moves you up or down the range: square footage, how much failed base has to come out, whether the edge restraint has to be rebuilt, and the paver line you choose. A partial rebuild on a 300-square-foot apron sits near the low end; a full driveway with full excavation and new base sits near the top. We don’t quote from a phone call guess. We measure, look at the base, and put the line items in writing. If a price changes after work starts, you get a written change order before the next paver moves, and every eligible job gets its permits pulled and inspections signed. The completed work also carries our 90-Day Done Right Promise.
DIY or Call Us?
A homeowner can safely do a few things. Walk the drive and mark every rocking, sunken, or heaved paver with chalk. Rake and observe where water runs after a rain, and check whether the pavers sit below or above grade at the house. Take photos of the failed area and note the paver dimensions with a tape.
Where DIY goes wrong is lifting and resetting a paver without addressing the base. On a driveway, a paver sitting on loose or washed-out sand will rock again in weeks, and pulling pieces out of a settled field can crack the neighbors. A few things to know before you decide: Techo-Bloc makes driveway and patio systems only, so if your surface is concrete or asphalt, this page’s price ranges below apply differently. KraftMaid, Cambria, Silestone and other brands we also work with are for kitchens and baths, not hardscape. And if your drive holds standing water or the pavers sink every wet season, the fix is a base and drainage repair, not sand and a tamp.
Call us at (833) 620-6162 and we’ll walk it with you. A live person answers the phone 24 hours a day, 7 days a week, and a free second opinion on any written estimate is standing policy. No trip charge inside the county.
FAQs

Fifteen to twenty-five years is a realistic expectation for a properly built base, and failures in that window almost always trace to base or drainage rather than the pavers. Fremont’s wet winters and expansive clay soils stress drainage, so a drive that doesn’t shed water well will fail faster than the material itself. Call (833) 620-6162 if your drive is past ten years and starting to show it.
Yes, if the failure is isolated to one section and the base elsewhere is sound. We repair sections where the cause is localized, and we rebuild where the base or drainage is the problem. A spot fix on a drive with a systemic drainage issue just moves the problem down the street. Our crew walks the whole surface before recommending either path.
A partial section rebuild usually takes one to four days depending on square footage and how much base has to be replaced, and a full driveway replacement often runs a week or two, weather permitting. We’ll give you a written schedule with your estimate, and if the schedule changes, we call before the crew shows up. Scope, allowances, and any price change are all in writing.
We source the matching Techo-Bloc line through our material suppliers, matching thickness, color family, and finish as closely as current production allows. We do not stock pavers or carry parts on a truck; we order what the job actually needs. Current production colors can vary slightly from what was laid years ago, so we blend new units into the field rather than replacing a whole section in one color lot. Every material line is itemized in your written scope before we order.
We’ve been doing hardscape work across Fremont for a long time, and Tom Barrett will still pick up the phone when you call. Ask anyone on your street, or look up the license and address we publish before you sign anything. Our technicians have up to 28 years of experience, and every eligible job gets permits pulled and inspections signed. Call (833) 620-6162 for a free estimate on your Fremont driveway or paver project, and we’ll walk it with you.
Written by the team at Barrett & Sons Construction Fremont, serving Fremont and nearby areas.












