







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Home Additions & ADU: The Fremont Owner’s Guide
The answer up front: Unilock is a hardscape brand. It doesn’t make home additions or ADUs. So when a Fremont homeowner searches “Unilock home additions & ADU,” what they’re usually looking for is one of two things. Either they want the Unilock paver surfaces (patios, walkways, driveways) that tie into their addition or ADU project, or their paver or wall unit has failed and they need it matched and repaired. A home addition in Fremont runs $45,000 – $130,000 installed depending on size, foundation, and finishes. A detached or attached ADU runs $90,000 – $220,000. We’re an independent contractor, not affiliated with Unilock. We install Unilock-compatible surfaces and structure on additions across Fremont, and we’ll tell you plainly which is which before you sign anything.

Owners usually find the problem the same way. A patio edge near the new addition starts heaving after a wet winter. A retaining wall face settles and a unit slides out. Or a paver under a downspout washes out and stands proud of its neighbors by an inch. That’s when they pull up a search bar and type the brand name they remember from the pallet tag.
Key Takeaways
- Unilock makes masonry and paver products, not additions or ADUs. The brand is a surface material, not a structural one.
- A Fremont home addition typically lands between $45,000 and $130,000. An ADU runs $90,000 to $220,000.
- Fremont’s clay-heavy soil and wet winters are the leading cause of paver and wall edge movement around additions.
- Permits are pulled and inspections signed on every eligible job. No change order, no work.
Which Unilock Models This Applies To

The first thing to sort out: what part of your project is actually Unilock. If you’re planning an addition or ADU, the Unilock material is almost always the exterior hardscape, the patio at the new slider, the walkway to the ADU entry, or a low retaining wall. Unilock’s hardscape lines break into a few families you’ll recognize from the pallet tag or the contractor’s samples. The Brussels Block and Brussel Dimensional lines are the classic tumbled rectangular unit, common on Fremont patios. The Beacon Hill line is a larger format wall and step unit. The Rivenstone and Bristol Valley lines run toward textured, natural-looking faces. The pavers themselves are typically 60mm or 80mm thick for patios and walkways, and 2¼ to 3 inches is the normal reading if you’re measuring a pulled unit.
Identifying the right match matters, because Unilock has changed some colors and unit dimensions over the years. A Brussels Block from a 2010 pallet may not match a 2024 unit in the same color name if the batch and the surface texture shifted. Before you buy or replace, pull a single unit, measure it, photograph the tag on the pallet if you still have one, and note the color name. That’s the start of a clean match.
On the OEM-versus-aftermarket question: Unilock is the OEM here, and staying with the branded line is usually the right call for repairs in Fremont, because matching color, thickness, and the surface texture keeps the repair invisible from the sidewalk. Quality aftermarket pavers exist, but they only work if the units match the Unilock modules closely in height and the surface reading is close. A mismatched unit will crack or rock because the load paths don’t line up.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Unilock Home Additions & ADU Is Failing
For Fremont, the failure shows up at the edges and joints, not in the middle of a well-built patio. Here’s what to look for, and what each sign is telling you:
- Heaving or rocking units. A paver that stands proud of its neighbors by a quarter-inch or more usually means the base under that unit has settled or the joint sand washed out. In Fremont’s clay soil, water pools and the base displaces.
- Washout at downspouts and slopes. If the paver surface next to your addition shows a dip or a rut near a downspout, the subgrade is being undermined by runoff. That’s a base problem, not a paver problem.
- Wall face settling or unit slippage. On a Unilock retaining wall along your ADU walkway, a face that leans out or a unit that has slipped forward means the drainage or the geogrid behind the wall has shifted. Retaining walls near an ADU are load-bearing ground.
- Cracked or spalled units. One or two cracked pavers in a Fremont freeze-and-thaw winter is normal wear. Cracks spreading in a line across multiple units points to a base failure underneath.
- Moss, algae, and dark joint lines. Persistent moss in shaded Fremont yards isn’t just cosmetic. It means the surface and joints are staying wet, and wet joints fail faster than dry ones.
If any of those signs shows up next to an addition or ADU, the fix is usually about 60% base prep and 40% paver replacement. That’s the honest ratio.
Replacement Cost & What’s Included

For the addition and ADU side of this page, here’s the pricing that drives the project budget in Fremont:
| Project | Installed Range (Fremont) |
|---|---|
| Home Addition (structural, with Unilock exterior hardscape) | $45,000 – $130,000 |
| ADU Construction (detached or attached, with Unilock surfaces) | $90,000 – $220,000 |
| Garage Conversion (with Unilock entry surface) | $30,000 – $80,000 |
| Paver Patio Install (Unilock) | $3,500 – $11,000 |
| Paver Driveway Install (Unilock) | $7,000 – $18,000 |
The addition range is driven by three things: foundation complexity (Fremont hillside lots cost more than flat lots), square footage, and finishes. If the addition ties into Unilock hardscape, that surface work is a separate, itemized line in the written scope, not lumped into a vague “sitework” number. Every part, every paver, every base layer gets priced on paper. The 90-Day Done Right Promise is written on every contract. If the paver surface around your Fremont addition settles after we hand it over, one call brings us back to make it right.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Here’s the honest split. What you can safely check yourself: lift one loose paver, look at the base below it, note the color and thickness, pull the tag off the pallet if it’s still there, and photograph the wall or the failing area next to your addition. That’s the information we need to quote a repair. What usually goes wrong when homeowners go further: lifting pavers along a wall that’s supporting an ADU walkway, or cutting out a base under a surface that a foundation footing is tied to. A retaining wall next to a structure is not the place to experiment. There’s real weight involved, and the ground around an addition or ADU is carrying load.
If the paver work is purely surface repair, a homeowner can sometimes reset a single unit. If the wall face is settling or the addition’s edge is moving, that’s structural, and it should be looked at by a trained eye. Call (833) 620-6162 and we’ll walk you through what you’re seeing. No trip charge inside the county, and the estimate is free.
FAQs

Typically 25 to 30 years with a properly built base, and less if the base was under-built. In Fremont, the base matters more than the paver. A Unilock paver on a 6-inch compacted base with proper drainage will outlast a thicker paver on a shallow base. If you’ve got one failing area, it’s almost always a base issue rather than a paver-age issue.
Yes, in most cases. A single rocking paver, a washout at a downspout, or a spalled unit at a step can usually be lifted, the base reworked, and the same unit or a matched replacement reset. Only when the base is failing across a wide area is a tear-out necessary. Call (833) 620-6162 and we’ll tell you which, after a look.
A single paver repair is usually a one-day job in Fremont; a larger section with base rework runs two to three days. A retaining wall repair and reset is longer, and an addition or ADU project runs on its own schedule, weeks to months depending on permitting and inspections. Every price change is quoted in writing before work starts, so there are no surprise invoices at the end.
We source through the Unilock line and its distributors, matching color, thickness, and surface to your existing units. We don’t claim to carry units on a truck or stock them locally. That’s an honest answer: the match depends on the line and the color still being manufactured, which is why pulling one unit to photograph before we order is the first step. If the exact line has been discontinued, we’ll tell you the closest match and let you decide.
We also work with KraftMaid, Cambria, and Silestone on the interior side of addition and ADU projects, so the whole scope lands with one written plan.
Call for a Free Estimate
If you’ve got a Unilock surface that’s failing around your Fremont addition, or you’re budgeting the addition or ADU itself, the next step is a written, itemized estimate. Not a phone number that changes at the door. Every scope, every allowance, and every change order in writing before a single nail moves. Call (833) 620-6162 to schedule your free estimate. A live person answers, day or night.
Written by the team at Barrett & Sons Construction Fremont, serving Fremont and nearby areas.












