







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Union City
Adding a room, converting a garage, or putting a detached ADU on a Union City lot is a big spend, and the price you’re quoted should match the bill you get. We build additions and ADUs across 94587, from the flat tract blocks off Alvarado-Niles to the steeper parcels climbing toward the Hayward Hills. Our technicians have up to 28 years of experience, every eligible job gets permits pulled and inspections signed, and every price change comes to you in writing before work moves. Call (833) 620-6162 to schedule a free estimate.
Why Barrett & Sons Construction Fremont Is Union City’s Preferred Home Additions & ADU Company

Barrett & Sons Construction was founded in 1998 and is owner-operated, with Tom Barrett and his sons on-site most days rather than a franchise sending strangers. That matters in a city where the flatlands and the hillsides carry completely different engineering realities a half-mile apart. We know which Union City parcels fall under city rules and which fall under county jurisdiction, and we price the grading and drainage on a hillside lot alongside the structure instead of after it.
Union City customers tell us they came to us after a national outfit quoted one number on the phone and handed over a different bill at the door. Our answer is to put scope, allowances, and change orders in writing every time, because an allowance that isn’t on paper is a surprise waiting for a date. Tom publishes his name, address, and license number so you can look them up before you sign anything, and every eligible job is backed by our written 90-Day Done Right Promise. A live person answers the phone 24/7, and a call to Union City gets you a straight answer, not a voicemail box.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Union City
We handle the whole span of addition and ADU work in Union City, and the local conditions that move the price get scoped before we quote. You can see the full range of what we build on our Home Additions & ADU page.
ADU Design & Permitting
The first question on a Union City ADU is who signs the permit. Parcels near the BART corridor and the flat tract blocks generally run through the city, while some lots on the Hayward Hills edge and acreage parcels fall under county jurisdiction. Getting that wrong stalls your project mid-draw, so we confirm the permitting path and pull the permits and inspections before framing starts.

Garage Conversion ADU
A garage conversion is the fastest route to rentable square footage on a tight Union City lot, and it usually runs $30,000 – $80,000. Many postwar 1950s and 60s garages in the flats weren’t built for a living space above them, so we check the slab, wiring, and foundation before we price the build-out.

New Detached ADU
A new detached ADU is a ground-up structure, and on an open Union City lot the pad, utility trenching, and storm drainage are often as large a cost driver as the building itself. We start with a site and soils review, then scope the foundation, rough-in, and inspection sequence with a draw schedule so the sequence is priced up front.

Junior ADU & Interior Conversion
A junior ADU or interior conversion works well in the older stucco bungalows and two-story subdivisions around Union City, turning unused space into separate living quarters. We handle the layout, the egress and life-safety details, and the permits so the conversion passes inspection the first time through.
Trusted Brands We Service in Union City
When a roof meets an addition or an ADU gets a new lid, we install brands you can look up rather than mystery materials off a van. GAF and CertainTeed shingles are common on Union City additions, and Owens Corning shows up on ADU roofs where a homeowner wants a known product with a real warranty behind it. We don’t keep parts on a truck or stock locally, so the right material gets ordered to the job and installed to spec, and the turnaround stays quick.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Union City Homes
- Permitting handled as city-only when the parcel is county. On acreage and hillside lots, assuming city jurisdiction can stall an addition or ADU right as the first draw is due, and the fix costs time as well as money.
- Hillside grading and retaining walls scoped apart from the ADU. Up toward the Hayward Hills, a winter storm is as likely to expose a failing retaining wall as a roof leak, and when the drainage isn’t bundled into the original scope you pay for it twice.
- Long hauls and tight equipment access underestimated. On open Union City lots with a narrow access drive, staging and haul costs that were never in the allowances show up later as a bill nobody planned for.
- Shallow foundations and old wiring in the flats. The postwar ranch homes near the BART corridor often carry shallow foundations and knob-and-tube-era wiring, so any addition or conversion has to account for what’s under the floor before the walls go up.
Pricing for Home Additions & ADU in Union City, CA
Honest pricing is the whole point, so here are the ranges we see on Union City jobs. A typical room addition runs $45,000 – $130,000, a garage conversion runs $30,000 – $80,000, and a full detached ADU runs $90,000 – $220,000. What pushes a Union City job toward the top of those ranges is the site itself: hillside grading, retaining-wall and drainage scope on the slopes, county versus city permitting, and haul and staging on an open lot. Our estimates are free, and every allowance and change order arrives in writing before a nail moves, so the number you sign is the number you pay.
| Project | Typical Union City Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Union City
We build additions and ADUs across the East Bay, and if you’re in Union City we also work the neighboring towns of Newark, Fremont, Fairview, and Hayward. Same written scope, same permit-pulling, same 90-Day Done Right Promise wherever you are on this side of the bay.
Serving Union City, CA – Our Local Coverage Area
We serve Union City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Union City

It depends on the parcel, and this is exactly where a Union City project can stall. Some lots, especially larger acreage and parcels on the Hayward Hills edge, fall under county jurisdiction rather than the city, so we confirm the permitting path first and pull the permits and inspections on the correct side before framing. Call (833) 620-6162 for a free estimate and we’ll sort out which path your lot takes.
Because the site, not the square footage, drives it. A half-mile separates the flat Alvarado-Niles tract lots from the steep Hayward Hills parcels, and hillside additions routinely trigger grading, retaining-wall, and slope drainage scope that a flatland neighbor never sees. Those items get bundled into the estimate up front rather than surfacing as change orders, and the price reflects the real site.
On an open lot, the buildable pad, utility trenching, and storm drainage are often as large a cost driver as the structure itself. We start with a site and soils review, then scope grading on a slope, well or septic setbacks if the parcel has them, and the long material hauls down a narrow access drive before a single form is set. That’s how the foundation, rough-in, and inspection sequence gets priced up front.
Around the rain, not against it. The marine-influenced Bay Area climate here brings mild, wet winters and dry summers, so we schedule foundation, concrete, and roofing work inside the dry windows and push fire-hardening and drainage work on hillside projects into the dry season. That keeps the sequencing honest and avoids rework after a storm.
Every scope, allowance, and price change in writing before the work happens. On Union City jobs, county versus city permitting, hillside drainage, and haul costs are all priced into the original quote rather than added later, because an allowance that isn’t on paper is a surprise waiting for a date. Every eligible job is backed by our written 90-Day Done Right Promise, so if something isn’t done right, Tom comes back and makes it right.
Whether you’re planning a room addition, a garage conversion, or a full detached ADU on a hillside or acreage lot in Union City, the next step is a free estimate with the scope and site conditions written out in plain terms. Call (833) 620-6162 to schedule yours, and a live person will answer.
Written by the team at Barrett & Sons Construction.












